Case Study
Peerless EDGE® Retrofit: 9 Units – 3-on-1 CC


OWNER/OPERATOR: CLECO – Acadia Generating
LOCATION: Eunice, LA
YEAR BUILT: 10-12 year old AIG’s installed Summer 2017 through Spring 2019
RESULTS:
Reduction in ammonia consumption of approx. 15%-35% (load dependent)
Projected extension of 2-3 more years until capital catalyst replacement
MAIN PARAMETERS
Turnkey Retrofit of Peerless EDGE® AIG
Designed for minimal outage time – Including no external piping modifications

